Tuesday, August 10, 2010

Kegerator Days 4 – A Tuesday

The rest of my goodies arrived in the mail on Tuesday and when I got home from work I went directly into the basement to put together what I could.  In my handful of packages was the 4 way CO2 distributor which I attached to the inside of the collar above where the CO2 canister will sit and attached all of the CO2 lines.  I also used larger conduit clamps to keep all of the lines in place along the sides of the freezer. 

At this point I believe I am pretty much ready to start using this bad boy.  All I need to do is procure some corny kegs and turn the freezer on.  Along those lines I also received and “installed” (hung on the outside of the freezer) the temperature controller which will hang on the inside of the freezer when it is on and keep us in the correct temp range.  I am waiting for final installation of this until after I have all of the kegs in place so I can be sure the placement will not be touching any of them.  I am also waiting on the kegs to cut the beer and CO2 lines to the proper size so I can eliminate extra tubing and keep everything as clean as possible. 

So until I find the cheapest place to get some kegs, and finish some beer to put in them I am in a holding pattern waiting on the tap handle thread insert and kegs so I can finish everything up and get to drinking!!

________________________________________________________

“The problem with the world is that everyone is a few drinks behind”  - Humphrey Bogart

No comments:

Post a Comment